スイス
スイス

myGeobrugg

 - Mühlehorn, Highway A3, Glarus Nord 2015

Protected roadway and railway infrastructure

 - Mühlehorn, Highway A3, Glarus Nord 2015

Drilling above the highway

 - Mühlehorn, Highway A3, Glarus Nord 2015

Rockface after completion of the TECCO® installation

 - Mühlehorn, Highway A3, Glarus Nord 2015

RXE type barriers and TECCO® System supporting each other

 - Mühlehorn, Highway A3, Glarus Nord 2015

Location: Walensee, Switzerland Federal Office of Topography National Map 1:50'000

 

システム

 

設置年

2015

状況

The highway A3 was opened in 1964 and passed as a 2-lane road the topographic bottleneck of the Walensee, one of the main threats on the way from the Swiss plains to the mountainous regions and ski resorts. In 1986 one of the most frequented tunnels was extended to four lanes. Due to a significant exposition to rockfall and rockslides, from the beginning of its existence the route had to be protected against natural hazards.

With increasing traffic and widening the formerly narrow path to a highway, also protection measures had to be adapted and extended.

In 2012 the Swiss Federal Roads Office FEDRO decided to realize several urgent maintenance works being unavoidable in order to keep the road open. In parallel risks and protection needs were re-evaluated and a general project to ensure safety of the highway was initiated. After the planning phase from 2013 to 2015 the first protection systems of the new generation were installed.

Hot-spots along the passage have been the various tunnel entrances, opening to steep slopes or even sheer rock faces.

Official project name at the FEDRO, Federal Office for Roads: Glarus Nord

Overall costs of the protection project (estimated in 2014): 11 Million Swiss Francs

説明

This description shows the part stabilized with TECCO® System. A parallel project, Kerenzerberg HighKerenzerberg Highway A3 is showing rockfall barriers type RXE-8000 (also partly visible on the pictures).

Unstable slope and rock sections between and behind the fence lines were stabilized using TECCO® G65/4. Geology and topography required using the unique performance of TECCO® mesh as well as the strength of 4 mm high-tensile strength steel wire to bear the shearing forces and puncturing loads of stabilized rock masses.

顧客名

FEDRO Federal Roads Office, Switzerland

落札者

CRESTAGEO, Chur, Switzerland

保護対象

道路, 鉄道

腐食防止

ジェオブルッグ スーパーコーティング

エンジニアリング

Project Partners Ltd Consulting Engineers, Grancia-Lugano, Switzerland

その他設置済み工法

落石対策工

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム