スイス
スイス

myGeobrugg

 - Gaviota Pass 2004

Ringnet barrier at work

 - Gaviota Pass 2004

Debris flow barrier

 - Gaviota Pass 2004

Ringnet barrier protecting th culvert

 

システム

 

システム延長

13 m

 

設置年

2004

状況

This drain was regularly blocked by alluvial material.

説明

Installation of a ring net barrier directly in front of the culverts that retains solid material and allows watery, fine material to flow through. The material was retained in the course of three debris flow events without impairing the through traffic. Following excavation the barriers were again fully functional.

顧客名

-

保護対象

道路

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム