スイス
スイス

myGeobrugg

 - Beartooth Highway Debris Flow 2003

Site overview

 - Beartooth Highway Debris Flow 2003

Modified RXI-200 debris flow barrier

 - Beartooth Highway Debris Flow 2003

Debris flow channel

 - Beartooth Highway Debris Flow 2003

Modified RXI-200 debris flow barrier

 - Beartooth Highway Debris Flow 2003

View of upslope support ropes with brake ring on modified RXI-200 debris flow barrier

 

システム延長

25 m - 40 m

 

設置年

2003

状況

A massive debris flow had closed the road which is one of the main access routes to Yellowstone National Park. 

説明

Three separate sections of modified RXI barriers were installed to mitigate the debris flow hazard.  Three system sizes:

40 linear meters at 7.5 meters high
40 meters at 6 meters high
25 meters at 4.5 metesr high.

顧客名

Montana Transportation Department

落札者

HI-Tech Rockfall Construction

保護対象

道路

エンジニアリング

Shannon & Wilson - Seattle, Washington

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム