myGeobrugg
2010
Protection of haul road and railway line for transportation of iron ore.
Combined solution of deep anchored wall with TECCO® System slope stabilization system and TECMAT® erosion control.
VALE (Cia. Vale do Rio Doce, Brazil)
Chemin de fer, Carrière / Mines
Exploitation minière / Tunnel