雪崩防护 - Cougar Corner 2016

Installed SPIDER® Avalanche barrier - part of the largest snow net barriers project in North and South America. Photo Courtesy of West Coast Scalers.

雪崩防护 - Cougar Corner 2016

Overview of the installation site before works execution. Visible Trans-Canada Highway below.

雪崩防护 - Cougar Corner 2016

Construction required very demanding rope access. Our specialists were consulting the whole project constantly - here during stake-out.

雪崩防护 - Cougar Corner 2016

Another example showing demanding conditions!

雪崩防护 - Cougar Corner 2016

Light weight drilling equipment suspended on ropes was the only reasonable choice to get the job done.

雪崩防护 - Cougar Corner 2016

Drilling of anchors and micro piles in steep and complicated terrain of Cougar Corner 7.

雪崩防护 - Cougar Corner 2016

Perfect example of strong work commitment! Photo Courtesy of West Coast Scalers.

雪崩防护 - Cougar Corner 2016

Thanks to lightweight components, helicopter transportation was very efficient. In fact that was the only possible way of bringing material to construction site.

雪崩防护 - Cougar Corner 2016

Special debris flow barriers with snow retaining capacity were installed amongst SPIDER® Avalanche barriers in a very demanding geomorphologic conditions. Perfect terrain adjustability is visible.

雪崩防护 - Cougar Corner 2016

Proud installation crew – finishing touches at the top of Cougar Corner 7.

雪崩防护 - Cougar Corner 2016

Overview of the installed SPIDER® Avalanche barrier.

雪崩防护 - Cougar Corner 2016

Trans-Canada Highway directly below the SPIDER® Avalanche.

雪崩防护 - Cougar Corner 2016

Cougar Corner - the largest snow net barriers project in North and South America (over 2000 m SPIDER® Avalanche and three 20 m wide UX debris flow barriers). Cougar Corner 8 shown here (approx. 25 % of the entire project).

 

系统长度

6 m - 91 m

 

安装年份

2016

情况

The Trans-Canada highway travels through the Glacier National Park and over Rogers Pass which is well known for numerous avalanches each year.

Since the late 1950’s avalanche control was conducted by Parks Canada Agency and the Canadian Armed Forces by shelling slide areas with howitzers. While this mitigation system functioned, there was still the issue of blocking the Trans-Canada by man-made slides. Remote Avalanche Control Systems (RACS) were also considered, however there was still a potential of blocking the highway with snow slides. To keep the highway clear all winter long it was decided to hold the snow in place with snow nets.

In December 2015, Parks Canada Agency invited contractors to bid on installing approximately 2000 meters of Dk 3.5 and Dk 4.5 snow nets. Avalanches in Glacier National Park slide directly on to the Trans-Canada Highway which runs right through the park. Closed highways cost Canada millions of dollars every year if blocked due to snow and rock slides.


描述

Three slide paths were to be secured. They are called Cougar Corner No. 6, 7, and 8. Each slide area has its own challenges.

Alpine Solutions determined the net locations and net sizes as well as prescribing three Geobrugg UX Debris Flow Barriers in channels too incised to accommodate traditional snow nets.

Bidding was a challenge for contractors as the site was covered with 4 meters of snow in December. BAT Construction Ltd. was the successful bidder, and chose Geobrugg SPIDER® Avalanche. The contractor was able to install over 1000 meters of nets and drill anchors for 2000 meters of nets all in the summer of 2016. No small feat at this location!

To date this is the largest snow net project in North and South America: 1000 meters done so far, 1000 meters more to go. First debris flow barrier installed entirely by helicopters in North America.

客户

Parks Canada Agency

承包商

BAT Construction Ltd.

防护对象

Road

腐蚀保护

Galvanized, GEOBRUGG SUPERCOATING

工程

Alpine Solutions Avalanche Services - Brian Gould

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址