Elveţia
Elveţia

myGeobrugg

Stabilizarea pantelor - M80 Ring Road Upgrade 2011

.

Stabilizarea pantelor - M80 Ring Road Upgrade 2011

.

Stabilizarea pantelor - M80 Ring Road Upgrade 2011

.

Stabilizarea pantelor - M80 Ring Road Upgrade 2011

.

 
 

Anul instalării

2011

Situația inițială

-

Descriere

The TECCO slope stabilisation system was selected to stabilise a new cutting, as part of the M80 ring road upgrade. The cutting, comprising of highly weathered basalt, was 84 degrees and up to 10m in height. Due to the highly weathered nature of the rock, an erosion control mat was placed underneath the mesh. Approximately 2500m2 of mesh was fixed to 5m long soil nails on a 2 x 2m, staggered pattern.

Client

Tulla Sydney Alliance

Obiect protejat

Road

Protecţie împotriva coroziunii

GEOBRUGG ULTRACOATING

Tehnologie

Douglas Partners

Contactul dvs. local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Industriestrasse 21,5200 Brugg / Elveţia Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Elveţia Ticino Country Manager

E-mail