Suíça
Suíça

myGeobrugg

Estabilização de taludes - JiJi Tour Line 2020

TECCO® G65/3 prevents unstable rocks from falling onto the railway line

Estabilização de taludes - JiJi Tour Line 2020

Rocky slope above the railway line before the installation of the mesh

Estabilização de taludes - JiJi Tour Line 2020

During installation of the mesh

Estabilização de taludes - JiJi Tour Line 2020

Installation of the spike plates which are part of the slope stabilizing system

Estabilização de taludes - JiJi Tour Line 2020

The flexible mesh following the contour of the terrain

 
 

Ano de instalação

2020

Situação inicial

Due to heavy rain in 2020, the JiJi Railway encountered a slope failure (at Sta.K18+300). A rigid H-pile fence could not guarantee the required safety for the railway.

Descrição

The Taiwan Railways Administration (TRA) decided to stabilize the rockface with TECCO System.

Contratante

Jin Xin Engineering Co., Ltd.

Objecto protegido

Caminho de ferro

Proteção contra a corrosão

GEOBRUGG SUPERCOATING

Empreteiro

United Geotech, INC.

O seu contacto local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Riscos naturais
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suíça Ticino Country Manager

E-mail