The Real State development cut the slope too steep, what caused superficial stability problems. It was necesary to design a global stabilization solution with erosion control measure on the surface.
Tosca rock, fracture blocks and residual soil.
DELTAX® mesh with an erosion control mat and SAS soil nails dia. 22 mm were installed.
Phone | +1 860 377 3230 |
Phone | +1 909 706 8964 |
Phone | +1 505 220 1404 |
Phone | +1 336 337 0945 |
Phone | +1 505 771 4080 |
手机 | +1 505 400 0796 |
Phone | +1 503 423 7258 |