瑞士
瑞士

myGeobrugg

落石防护 - La Roche-Blanche 2020

RXE-5000 ringnets protecting the village of La Roche-Blanche (photo credit: Pierre-Yves Giraud, Géop)

落石防护 - La Roche-Blanche 2020

RXE-5000, 6 meters high, 36 meters long in three fields (photo credit: Pierre-Yves Giraud, Géop)

落石防护 - La Roche-Blanche 2020

RXE-5000, 6 meters high, 84 meters long (photo credit: Pierre-Yves Giraud, Géop)

落石防护 - La Roche-Blanche 2020

View up to the unstable limestone rockface (photo credit: Pierre-Yves Giraud, Géop)

落石防护 - La Roche-Blanche 2020

View of the rockface and the RXE-5000 behind the houses, almost invisible (photo credit: Pierre-Yves Giraud, Géop)

落石防护 - La Roche-Blanche 2020

View of the RXE-5000 protecting the village of La Roche-Blanche (photo credit: Pierre-Yves Giraud, Géop)

落石防护 - La Roche-Blanche 2020

View of the two fold protection systems (photo credit: Pierre-Yves Giraud, Géop)

 

系统

 

系统长度

36 m - 84 m

 

安装年份

2020

情况

The rockfall problem at La Roche-Blanche came back to memory in Summer 2019 when large blocks detached from the limestone cliff above the village of La Roche-Blanche. They stopped in the nearest garden without causing much damage. Subsequently, the village ordered a survey of the rockface. The conclusion of this survey on the 22nd of December 2019 detailed the presence of a large fracture with the potential of imminent failure. A total of 1700 m³ was estimated to potential fail. It was decided to evacuate temporarily the residents living closest to the rockface, a tough decision to take just before Christmas.

描述

The authorities opted for a two-fold solution with a custom-made rockfall curtain just under the steep slope and a rockfall protection barrier RXE-5000 beneath it. 

The construction of the rockfall curtain had just been completed, and the posts of RXE-5000 set, when most of the unstable volume, 1500 m³, collapsed in mid-February. The rockfall curtain held back most of the material, nevertheless some parts of the ringnet barrier were damaged. After replacing parts, the installation was finally completed in March 2020.

承包商

防护对象

Building, Residential area

腐蚀保护

GEOBRUGG SUPERCOATING

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址