瑞士
瑞士

Grasberg Mine

Papua 98972, Indonesia, 印度尼西亚
2015
客户
Freeport-McMoRan Inc.
工程
Geobrugg
承包商
PT Freeport Indonesia
分包商
RPT-Indonesia
防护对象
Mine / Quarry
能级
8000 kJ
系统的高度
9.0 m
系统长度
50 m - 50 m
腐蚀保护
Galvanized, GEOBRUGG SUPERCOATING
其他安装的应用程序
矿井/隧道
情况

Rockfall hazard from the natural slopes above the mill area within the Grasberg mine had to be mitigated. After several incidents with boulders hitting buildings and infrastructure a fast and reliable solution had to be found.

描述

The RXE-8000 rockfall barrier was installed across a very active gully on the east side of the mill area. Several rockfall incidents with boulders up to 2 meters in diameter had affected the mill infrastructure before. To ensure safe operation of the mill area below the gully, the barrier was installed approximately 140 meters above office buildings and ore processing facilities.

本地联系方式

Roger Moor
Roger Moor
Country Manager Ost- und Zentralschweiz, Liechtenstein
自然災害防護, Coastal Erosion Protection, 矿井/隧道
Geobrugg AG
Aachstrasse 11
8590 Romanshorn / 瑞士
René Müller
René Müller
Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS
自然災害防護, 矿井/隧道
Geobrugg AG
Industriestrasse 21
5200 Brugg / 瑞士
Isacco Toffoletto
Isacco Toffoletto
Ticino Country Manager
自然災害防護, 矿井/隧道
Geobrugg AG Ticino
Stabile Cometal, via Pizzante 7
6595 Riazzino / 瑞士