瑞士
瑞士

myGeobrugg

Deutsche Bahn (German Railway) Backofen

落石防护 - Deutsche Bahn (German Railway) Backofen 2005

.

落石防护 - Deutsche Bahn (German Railway) Backofen 2005

.

落石防护 - Deutsche Bahn (German Railway) Backofen 2005

.

落石防护 - Deutsche Bahn (German Railway) Backofen 2005

.

 
 

系统长度

1100 m

 

安装年份

2005

情况

The railway line along the River Rhine is frequently effected by Rockfall and Debris flow events.

描述

Protects the railway against rock fall. For the permament monitoring of selected barriers 2024 several GUARDs where installed.

国家/地区

德国

客户

Deutsche Bahn (German Railway) Koblenz

工程

gbm Limburg

承包商

Feldhaus / B+M

防护对象

Railway

本地联系方式

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Western Switzerland

联系地址

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

联系地址

Matthias Denk, Msc. Env. Eng.
 

Matthias Denk

自然災害防護
Hydraulic Engineering
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 , Msc. Env. Eng.

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 瑞士 Country Manager Southern Switzerland

联系地址