瑞士
瑞士

myGeobrugg

落石防护 - Coal Mine 2021

Completely installed rockfall barrier GBE-100A-R

落石防护 - Coal Mine 2021

Rainfall washed out the soil, causing rockfalls

落石防护 - Coal Mine 2021

Anchor of the barrier

落石防护 - Coal Mine 2021

Upper part of the rockfall protection fence

落石防护 - Coal Mine 2021

Inspection - 461 meters of rockfall fence were installed

 
 

系统长度

24 m - 132 m

 

安装年份

2021

情况

The mine has an impressive safety record and has won the group Chairman’s Safety Shield for its consistent improvement and the group CEO Safety Award for the best safety record of all group operations worldwide.
Required was a protection of the portal / entrance to the underground operation against rockfalls and masses of soil from erosion of the upper benches.

描述

It was decided to install GBE-100A-R rockfall barriers; height is 2 meters, total barrier length of the five barriers is 461 meters.

  • 1 GBE-100A-R, 77 m long
  • 2 GBE-100A-R, 108 m long
  • 3 GBE-100A-R, 24 m long
  • 4 GBE-100A-R, 120 m long
  • 5 GBE-100A-R, 132 m long 

国家/地区

南非

客户

n.a.

承包商

防护对象

Mine / Quarry

腐蚀保护

GEOBRUGG SUPERCOATING

本地联系方式

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Western Switzerland

联系地址

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

联系地址

Matthias Denk, Msc. Env. Eng.
 

Matthias Denk

自然災害防護
Hydraulic Engineering
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 , Msc. Env. Eng.

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 瑞士 Country Manager Southern Switzerland

联系地址