瑞士
瑞士

myGeobrugg

Ciudad Bolivar, Cable Car (1)

落石防护 - Ciudad Bolivar, Cable Car (1) 2017

Impact protection system at work

落石防护 - Ciudad Bolivar, Cable Car (1) 2017

Lateral View

落石防护 - Ciudad Bolivar, Cable Car (1) 2017

Completely installed barrier

落石防护 - Ciudad Bolivar, Cable Car (1) 2017

During installation

落石防护 - Ciudad Bolivar, Cable Car (1) 2017

Holding back blocks of rock

 
 

系统长度

150 m

 

安装年份

2017

情况

The construction of the cable car in the city of Bogota required earthworks to set the pylons. At pylon no. 23 near the Illimani station (the last station of the system) a block retention system had to be installed.

For the works, more than 5 meters from the hill's top were removed. In order to protect the underneath lying houses from falling blocks.

描述

Additionally to the TECCO® slope stabilization system in the upper part, WARCO installed a GBE barrier dimensioned for 100 kJ.

Slope protection proSlope protection project Ciudad Bolivarject Ciudad Bolivar

客户

Union Temporal Cable Aereo

承包商

WARCO S.A.S

防护对象

Residential area

其他安装的应用程序

边坡稳定

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址