Chenani Nashri Tunnel Portal (2017)

边坡稳定 - Chenani Nashri Tunnel Portal (2017) 2017

Protected area in August 2017

边坡稳定 - Chenani Nashri Tunnel Portal (2017) 2017

Overview of the construction site

边坡稳定 - Chenani Nashri Tunnel Portal (2017) 2017

Drilling of rock bolts in progress using crane and drilling platform

边坡稳定 - Chenani Nashri Tunnel Portal (2017) 2017

Laying of coir mat which shall allow further vegetation and protect against erosion

边坡稳定 - Chenani Nashri Tunnel Portal (2017) 2017

TECCO® SYSTEM³ fully installed with coir net during hydroseeding process

边坡稳定 - Chenani Nashri Tunnel Portal (2017) 2017

GBE-500A as extra protection against rockfalls installed directly above tunnel portal

边坡稳定 - Chenani Nashri Tunnel Portal (2017) 2017

Another view of a GBE-500A rockfall barrier line

边坡稳定 - Chenani Nashri Tunnel Portal (2017) 2017

Slopes fully stabilized using TECCO® SYSTEM³, vegetation shows water outbursts

 
 

安装年份

2017

情况

The site was initially proposed to be treated with shotcrete but persistent seepage of water which caused slope failures and cracks on the portals led the concessionaire to go for an alternate solution which does not only stabilize the slopes but also offers a green solution and allows the hydrostatic pressure to disperse. National Highway Authority of India decided to actively stabilize the tunnel portals. A protective measure had to be selected to stabilize the exposed cutting against superficial instabilities, as well as tilts and slides of individual blocks and rockfalls.

The area of the slopes to be treated and protected amounts to a total of 32'000 m² which includes 4 berms and the top path up to a maximum height of ca. 55 m.

描述

The slope stabilization solution consisted of both active and passive protection measures.The flexible slope stabilization system consisting of TECCO® System and coir mat, system spike plates and soil nails had been selected. 

Each berm is stabilized using rock-bolts of a maximum depth of 20 m in conjunction with high tensile steel wire mesh. Perforated drain pipes, wrapped in geotextile, at an interval of 6.0 x 6.0 m are also installed to allow excess water to pass.

In addition, vertical and horizontal drainage channels are provided to channelize rain and excess water to pass and not accumulate and seep under the slopes. Variable grid patterns of 2.0 x 2.0 m and 2.5 m x 2.5 m are adopted on this project. 32 mm thick, fully threaded rock-bolts were used in this project and total drill lenght achieved is approximately 11'0000 m.

An additional GBE-500A rockfall barrier line was installed which can absorb impact energies up to 500 kJ.

See also our rockfall project Chenani Nashri Tunnel Portal (2)

客户

N.H.A.I. (National Highways Authority of India)

防护对象

Road, Infrastructure

腐蚀保护

GEOBRUGG SUPERCOATING

工程

IL&FS Transportation Networks Ltd.

其他安装的应用程序

落石防护

本地联系方式

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / 美国 Regional Manager Northeast

联系地址

Saleh Feidi
 

Saleh Feidi

Regional Manager California

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / 美国 Regional Manager California

联系地址

John Kalejta
 

John Kalejta

Regional Manager Central US

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / 美国 Regional Manager Central US

联系地址

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / 美国 Regional Manager Southeast

联系地址

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

自然災害防護
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

联系地址

Tim Shevlin
 

Tim Shevlin

Sales Director

自然災害防護
Geobrugg North America, LLC,Salem OR 97302 / 美国 Sales Director

联系地址