Elveţia
Elveţia

myGeobrugg

Stabilizarea pantelor - Nonguen Channel 2021

Stabilized channel slope

Stabilizarea pantelor - Nonguen Channel 2021

Spike plate P33 on the stabilized slope

Stabilizarea pantelor - Nonguen Channel 2021

Connection clips T3

Stabilizarea pantelor - Nonguen Channel 2021

Front view of the stabilized slope

 
 

Anul instalării

2021

Situația inițială

The west slope of the Nonguén Canal was unstable, as evidenced by numerous cracks in the concrete. This instability was a danger to the homes adjacent to the canal.

Descriere

In order to stabilize the slope TECCO® system was installed in all the sectors of the canal that showed fissures, cracks or settlements. After this installation, a shotcrete layer was placed on top of the stabilization system.

Obiect protejat

Infrastructură

Protecţie împotriva coroziunii

GEOBRUGG SUPERCOATING

Contactul dvs. local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Industriestrasse 21,5200 Brugg / Elveţia Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Elveţia Ticino Country Manager

E-mail