Proteção contra desprendimentos - Obernzell B388 2018

Rockfall protection fences 3 and 4

Proteção contra desprendimentos - Obernzell B388 2018

Pre-assembled posts in the area of fence 1 and 2

Proteção contra desprendimentos - Obernzell B388 2018

Rock face connection for fence 3

 

Sistemas

 

Comprimento do sistema

68 m - 175 m

 

Ano de instalação

2018

Situação inicial

Several rockfalls have occurred in the area of the Donauleiten (along the river Danube near Passau) in recent years. To temporarily protect the federal highway concrete guide walls and gap-filling nets were placed along the disused railway line.

Descrição

Parts of the road are protected with RXE-3000 rockfall barriers. Further barriers are in preparation for autumn 2019.

Promotor

Staatliches Bauamt Passau

Contratante

Felbermayr Bau GmbH & Co KG

Objecto protegido

Estrada, Caminho de ferro

Proteção contra a corrosão

Galvanizado, GEOBRUGG SUPERCOATING

Empreteiro

ifb Eigenschenk GmbH

O seu contacto local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Riscos naturais
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suíça Ticino Country Manager

E-mail