Suiza
Suiza

myGeobrugg

Protección contra caídas de rocas - Kaikōura SH1 - SR8 and 9 2021

ATT looking north side protecting the road

Protección contra caídas de rocas - Kaikōura SH1 - SR8 and 9 2021

ATT 60 drops stones to the ground in a controlled manner

Protección contra caídas de rocas - Kaikōura SH1 - SR8 and 9 2021

Top view from the barrier

Protección contra caídas de rocas - Kaikōura SH1 - SR8 and 9 2021

ATT 60 looking south onto the sea

 

Sistemas

 

Longitud del sistema

110 m

 

Año de instalación

2021

Situación inicial

The Kaikōura M7.8 Earthquake caused widespread damage to the road and rail corridor 20 km North and South of the Kaikoura town ship. Over 40 major slips inundated the road and rail with over 750,000 m³ of material form source zones up to 500 m above sea level.  The highly fractured Grey Wacke meant frequent future rockfalls were expected. The rockfall frequency and wide run out area at SR8 and 9 created the requirement for a system that attenuated the rockfall energy to a manageable level, was quick to install and required minimal future maintenance. The Slope on average is approximately 50 degrees but in some parts is near vertical.

Descripción

A 110 m wide rockfall attanuator (ATT - 60) with a 35-40 m tail was specified due to its high puncturing resistant yet light weight high tensile (1770 MPa) TECCO 65/4 tail which enables the attenuated material to pass down through to the lower section for clearing if required. The 65 mm aperture is small enough that no secondary mesh is required and the Ultracoating ensures design life in the coastal environment. The attenuator system utilises a 3 m high hinged post with a 16 m spacing and a support rope separation half way.  A double top rope was installed for increased safety in design and Type III flex heads were installed to transfer the load to the Gewi 32 anchor bar. Overall the benefits of an attenuator creating a quick and cost effective solution.

Cliente

Subcontratista

Objeto protegido

Carretera

Protección contra la corrosión

GEOBRUGG ULTRACOATING

Su contacto local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suiza Country Manager Ost- und Zentralschweiz, Liechtenstein

Correo electrónico

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suiza Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Correo electrónico

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Protección contra riesgos naturales
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suiza Project Manager Inspection Services

Correo electrónico

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suiza Ticino Country Manager

Correo electrónico