Suiza
Suiza

myGeobrugg

Protección contra flujos de detritos y deslizamientos superficiales - Kaikoura Coastal Pacific Rail (SH1) 2019

Looking West - VX080-H4 debris flow barrier with 12/3/350 ROCCO® ring net tail - note proximity to rail

Protección contra flujos de detritos y deslizamientos superficiales - Kaikoura Coastal Pacific Rail (SH1) 2019

Looking North - VX080-H4 debris flow barrier with 12/3/350 ROCCO® ringnet tail - note proximity to rail

Protección contra flujos de detritos y deslizamientos superficiales - Kaikoura Coastal Pacific Rail (SH1) 2019

VX080-H4 - debris accumulation as per design in the catchment ditch after moderate rain

Protección contra flujos de detritos y deslizamientos superficiales - Kaikoura Coastal Pacific Rail (SH1) 2019

Debris flow barrier to ROCCO® tail connection

Protección contra flujos de detritos y deslizamientos superficiales - Kaikoura Coastal Pacific Rail (SH1) 2019

Drape Support ropes to assist lower engery material to pass through

 

Sistemas

VX VX080-H4 Soluciones especiales

 

Año de instalación

2019

Situación inicial

The 2016 Kaikoura M7.8 earthquake caused widespread damage to the road and rail corridor some 20 km North and South of the Kaikoura township. Over 40 major slips inundated the road and rail with over 750'000 m³ of material from source zones up to 500 m above sea level. The highly fractured Grey Wacke means frequent future rockfalls and debris loads are to be expected. The high rockfall and debris load frequency created the requirement for a Geohazard Solution that attenuated the energy to a manageable level and guided the material down to a catchment area. Due to the proximity of the Coastal Pacific rail line space is limited.

Descripción

A VX080-H4  debris flow barrier was combined with a 12/3/350 ROCCO ring net tail. This system enables the rockfall and debris energy to be attenuated and guided down to a catchment area at the toe of the slope for easier clearing and reduced maintenance. Additional support ropes were also installed across the channel under the ROCCO® tail where it rested on the slope to enable the lower energy material to pass under and not get caught up. Short 0.5 m tethers were installed in the lower part of the tail to stop it from kicking out towards the rail in the larger energy events. TECCO® G65/3 was used as a secondary mesh as a robust solution was required due to the high frequency of the smaller high-velocity rocks.
Shortly after completion, the system demonstrated itself to be working well.

Cliente

KiwiRail

Subcontratista

Geovert

Objeto protegido

Ferrocarril

Protección contra la corrosión

GEOBRUGG SUPERCOATING

Su contacto local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suiza Country Manager Ost- und Zentralschweiz, Liechtenstein

Correo electrónico

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suiza Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Correo electrónico

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Protección contra riesgos naturales
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suiza Project Manager Inspection Services

Correo electrónico

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suiza Ticino Country Manager

Correo electrónico