Yol çitler - Clarea Bridge 2020

Clarea bridge, Susa Italy

Yol çitler - Clarea Bridge 2020

Sleeves were installed every 4 m to attach the panels to the bridge

Yol çitler - Clarea Bridge 2020

A particularly high performance crane was used to lift the mesh panels from the pre-assembly area to the deck

Yol çitler - Clarea Bridge 2020

Panels installed into sleeves

Yol çitler - Clarea Bridge 2020

Mobile debris fence panel has minimal visual impact

Yol çitler - Clarea Bridge 2020

Sleeved mobile debris fence system protects both the traffic above and the tunnel below

Yol çitler - Clarea Bridge 2020

Secondary mesh installed in order to stop small debris from dropping off the bridge

 
 

Sistem uzunluğu

2540 m

 

Kurulum Yılı

2020

Durum

The Trans-European Network Transport is building a new railway line from Lyon to Turin to complete the Mediterranean Corridor. Near Turin, the railway line passes under the Clarea Bridge. Therefore, starting with the works, the railway line had to be protected from falling objects. Due to the project's international significance, the customer wanted to install a tested and approved system.

Açıklama

Our mobile debris fence system was modified to the Clarea bridge. Instead of using concrete barriers for panel fixation, external sleeves had to be developed, which could be mounted to the bridge. As the fixation method was changed to the original homologated mobile debris fence system, intensive testing took place following the FIA Standard 3502-2018 debris fence. The test procedure includes a car impact with a speed of 120 kph, which exceeds the speed driven in this bridge section.

As delivery via several tunnels was impossible, the panels assembly took place under the bridge. The panel racks were driven to the site along the bridge for installation. One half of the bridge site conditions required a large crane to lift the panel racks to the installation truck. This service, along with the sleeve and panel installation, was provided as a turnkey solution.

For enhanced safety, a secondary mesh layer was installed to prevent small objects from falling.

The complete project foresees about 2'540 meters of barriers on the two parallel freeway lanes (four sides).

Müşteri

Yüklenici

Gösterilen obje

Road, Railway

Alt yüklenici

Yerel yetkiliniz

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Country Manager Ost- und Zentralschweiz, Liechtenstein

e-posta

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / İsviçre Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

e-posta

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Project Manager Inspection Services

e-posta

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / İsviçre Ticino Country Manager

e-posta