Amerika Birleşik Devletleri
Amerika Birleşik Devletleri

myGeobrugg

TECCO® TRAPUNTA – Higher safety under water

TECCO® Trapunta is designed for underwater application; the compact cell arrangement resists the most demanding conditions. It protects water-based infrastructures, such as harbor walls, bridge piers (e.g. from scouring) around and underwater installations of pipework and cables. TECCO® Trapunta also is used for  seabed sediment control as its flexibility enables it to adapt to the existing seabed. The high-tensile stainless-steel mesh ensures unparalleled durability in seawater.

TECCO® Trapunta is similar to the TECCO® CELL Mobile solution, but has been designed specifically for underwater application. A more compact arrangement of cells is used to resist the most demanding conditions. Providing protection of water-based infrastructure, such as scouring around harbour walls, bridge piers and underwater pipework and cables. This product also can be used for seabed sediment control as its flexibility enables it to conform very well to the existing seabed.

"Trapunta in Italian is a duvet or quilt. This describes the function of the flexible unit of mesh and local rock: It adapts well to the subsoil and protects with its heavy weight from wash-out or damage of any kind."

Efficient protection

Ready-made modules are simply placed on the areas to be protected, e.g. by mobile crane or from a barge.

Quick and wasteless preparation

Die Einheiten werden abseits des Einsatzortes mit allen erforderlichen Werkzeugen fertiggestellt.

Flexibility of cells

Multiple cells can be linked together.

Minimum environmental impact

The filling material consists of local rock. Components can not be released into the environment and the material can be recycled if cells are ever to be removed.

Long lifespan

High-class stainless steel components guarantee a long lifespan
even in highly corrosive environment.

İndirmeler

Videos

TECCO® CELL at Beesands by Shore Defence Ltd

Referanslar

Bu proje
Palena

Palena - Abruzzo, İtalya

 

Sistemler

 

Kurulum Yılı

2003

Bu proje
Beesands

Beesands, Kingsbridge, Birleşik Krallık

 

Sistemler

TECCO® CELL

 

Kurulum Yılı

2021

Kişiler

Kevin H. Coyle
   

Kevin H. Coyle

Regional Manager Northeast

Natural Hazards
Hidrolik mühendisliği
Saleh Feidi
   

Saleh Feidi

Regional Manager California

Natural Hazards
Hidrolik mühendisliği
John Kalejta
   

John Kalejta

Regional Manager Central US

Natural Hazards
Hidrolik mühendisliği
Bob Lyne
   

Bob Lyne

Regional Manager Southeast

Natural Hazards
Hidrolik mühendisliği