Stabilizarea pantelor - Schmerikon State Road 17 2013

Bird's eye view of the protected objects: State roadway, railway, bicycle path, building and port

Stabilizarea pantelor - Schmerikon State Road 17 2013

Slope failure seen shortly after the emergency work began a few days after the incident in June 2013

Stabilizarea pantelor - Schmerikon State Road 17 2013

Spider excavator during drilling

Stabilizarea pantelor - Schmerikon State Road 17 2013

Drilling along the top edge of the failed slope

Stabilizarea pantelor - Schmerikon State Road 17 2013

Drilling with manual equipment

Stabilizarea pantelor - Schmerikon State Road 17 2013

View of the upper section showing nailed TECCO G65/3, P33 spike plates and border rope

Stabilizarea pantelor - Schmerikon State Road 17 2013

Location: Zürichsee, Switzerland Federal Office of Topography, Bern, Switzerland National Map 1:50'000

 
 

Anul instalării

2013

Situația inițială

In the first days of June 2013 heavy storms and intense rainfall hit the region of the upper lake of Zurich. Due to saturation of the ground and instable geological conditions, a landslide buried a long section of heavily travelled commuter roadway and railway along the lake. This landslide caused complete closure of the infrastructure.

Geologie

Top Section: weathered marl

Bottom section: weathered sandstone / siltstone

Descriere

The department for underground construction initiated re-establishment and sustainable prevention of future similar incidents a few days later. To reach a quick decision and accelerate the construction, the department quickly involved local and regional partners.

Solutions discussed were rockfall barrier, manifold, or anchored TECCO® System the most favorable and ultimately chosen solution.

The upper slope section (marl) was protected and stabilized using a nailed mesh. The lower sandstone/siltstone section was covered with a drape to ensure that falling debris is kept close to the slope while being guided and deposited to the ditch.

Client

State Department for Underground Engenieering, Canton St.Gallen

Antreprenor

Oberholzer Bauleistungen Inc., Neuhaus, Switzerland

Obiect protejat

Road, Calea ferata, Infrastructură

Protecţie împotriva coroziunii

GEOBRUGG SUPERCOATING

Tehnologie

Dr. A. Gübeli AG, Jona, Switzerland

Contactul dvs. local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Industriestrasse 21,5200 Brugg / Elveţia Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Elveţia Ticino Country Manager

E-mail