Elveţia
Elveţia

myGeobrugg

Stabilizarea pantelor - Road to Rosa Khutor 2011

.

Stabilizarea pantelor - Road to Rosa Khutor 2011

.

Stabilizarea pantelor - Road to Rosa Khutor 2011

.

Stabilizarea pantelor - Road to Rosa Khutor 2011

.

 

Sisteme

 

Anul instalării

2011

Situația inițială

The road serves as access to the Olympic ski resort Rosa Khutor.

Descriere

 Above the concrete wall, SPIDER® Drape System with a secondary mesh has been installed in order to mitigate possible rockfalls. Up to 15 tons of unstable rock blocks required the strongest rock face protection. This led to the decision to use the strong SPIDER® Drape System.

Client

Engtransstroy

Antreprenor

Inzhzaschita

Obiect protejat

Road

Protecţie împotriva coroziunii

GEOBRUGG SUPERCOATING

Tehnologie

Inzhzaschita

Contactul dvs. local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Industriestrasse 21,5200 Brugg / Elveţia Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Elveţia Ticino Country Manager

E-mail