Stabilizarea pantelor - EDAR de Bakio 2017

The stabilized rockface above the wastewater treatment plant

Stabilizarea pantelor - EDAR de Bakio 2017

Rolling down the mesh - during installation works

Stabilizarea pantelor - EDAR de Bakio 2017

The mesh perfectly adapts to the ground

Stabilizarea pantelor - EDAR de Bakio 2017

A dynamic barrier GBE-1000A at the foot of the rockface protects during the installations of the stabilization system.

Situația inițială

Located in an old quarry, the Bakio wastewater treatment plant is surrounded by irregular, 50 meters high slopes. In the past, triple-twist mesh and bolts were installed as a stabilisation system. Due to the proximity of the sea, the system was damaged by corrosion. Also, the stabilization proved to be insufficient: Blocks of up to 30 tonnes came down - a constant threat for the workers.

Geologie

Limestone

Descriere

The customer opted for a stabilization system with stainless steel mesh consisting of TECCO® STAINLESS G65/3, horizontal reinforcing wire ropes, and GEWI bars of 32 mm in diameter, 8 meters long, with 3Vx4H drilling pattern.

A dynamic rockfall barrier GBE-1000A (1,000 kJ), 4 m high and 110 m long, was installed to protect the WWTP facilities during the stabilization works.

Client

Consorcio de Aguas Bilbao Bizkaia

Antreprenor

U.T.E. Taludes Bakio (Tecimasa-Lurpelan)

Obiect protejat

Infrastructură, Altele

Protecţie împotriva coroziunii

INOX / STAINLESS

Alte companii implicate

Tecimasa, Geobrugg Ibérica

Alte aplicaţii instalate

Protecţia împotriva căderilor de pietre

Contactul dvs. local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Industriestrasse 21,5200 Brugg / Elveţia Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Elveţia Ticino Country Manager

E-mail