myGeobrugg
2020
Removal of a 16,000 lb rock block
Geovert developed a methode to remove the boulder without any damage to the existing infrastructure located in the fall line directly below the block - escalators, and entrance to the Visitors Center Building.
Infra-estrutura turística
GEOBRUGG SUPERCOATING