Suíça
Suíça

myGeobrugg

El Jocotillo electrical substation

Estabilização de taludes - El Jocotillo electrical substation 2015

View of the slopes around the power station stabilized with TECCO® SYSTEM3.

Estabilização de taludes - El Jocotillo electrical substation 2015

TECCO® SYSTEM3 perfectly stabilized very steep slopes.

Estabilização de taludes - El Jocotillo electrical substation 2015

Another perspective of the electrical substation.

Estabilização de taludes - El Jocotillo electrical substation 2015

TECCO® SYSTEM3 installation: TECCO® G65/3 secured using system spike plates P33/40.

 
 

Ano de instalação

2015

Situação inicial

A slope of highly fractured and weathered volcanic rock with continually falling rocks endangered the security of an electrical substation at the bottom of the rock cutting.

Descrição

Slope stabilization with TECCO® system and anchor bolts D25 [mm] and length 4 [m].

Promotor

Eolic San Antonio

Contratante

Grupo PHI S.A.

Proteção contra a corrosão

GEOBRUGG SUPERCOATING

Empreteiro

Grupo PHI S.A.

O seu contacto local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Riscos naturais
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suíça Ticino Country Manager

E-mail