Suiza
Suiza

myGeobrugg

Estabilización de taludes - M80 Ring Road Upgrade 2011

.

Estabilización de taludes - M80 Ring Road Upgrade 2011

.

Estabilización de taludes - M80 Ring Road Upgrade 2011

.

Estabilización de taludes - M80 Ring Road Upgrade 2011

.

 
 

Año de instalación

2011

Situación inicial

-

Descripción

The TECCO slope stabilisation system was selected to stabilise a new cutting, as part of the M80 ring road upgrade. The cutting, comprising of highly weathered basalt, was 84 degrees and up to 10m in height. Due to the highly weathered nature of the rock, an erosion control mat was placed underneath the mesh. Approximately 2500m2 of mesh was fixed to 5m long soil nails on a 2 x 2m, staggered pattern.

Cliente

Tulla Sydney Alliance

Objeto protegido

Carretera

Protección contra la corrosión

GEOBRUGG ULTRACOATING

Ingeniería

Douglas Partners

Su contacto local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suiza Country Manager Ost- und Zentralschweiz, Liechtenstein

Correo electrónico

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suiza Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Correo electrónico

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Protección contra riesgos naturales
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suiza Project Manager Inspection Services

Correo electrónico

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Protección contra riesgos naturales
Ingeniería hidráulica
Minería / Túneles
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suiza Ticino Country Manager

Correo electrónico