Switzerland
Switzerland

myGeobrugg

Stanwell Park, Railway Corridor, 2020

Rockfall Protection - Stanwell Park, Railway Corridor, 2020 2020

Attenuator rockfall protection at the NSW Transport - railway in Stanwell Park

Rockfall Protection - Stanwell Park, Railway Corridor, 2020 2020

The mesh is unobtrusive, from a distance it is nearly invisible

Rockfall Protection - Stanwell Park, Railway Corridor, 2020 2020

Rocks are stopped and will fall down behind the mesh

Rockfall Protection - Stanwell Park, Railway Corridor, 2020 2020

Safe railway in Stanwell Park: Protected cutting allows safe passage of rail traffic

 

System length

147 m

 

Year of installation

2020

Initial situation

Rockfall into the rail corridor from both the crest and the face

Slope inclination: 80

Subsoil: Sandstone, weathered, jointy

Description

The rockfall protection system consists of a 147 l/m impact attenuator, a S3-130 (SPIDER®) drape tail, and a separate 650 m² S3-130 drape.

See the complete attenuator in this video

Contractor

Protected object

Railway

Corrosion protection

GEOBRUGG ULTRACOATING

Your local contact

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / Switzerland Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Switzerland

E-Mail