GEOHAZARD - FOLLOW US

Limbă
Românăro
Statele Unite
myGeobrugg

Înregistrare

Nu deţineţi un cont şi doriţi să vă înregistraţi?

În calitate de utilizator înregistrat myGeobrugg aveți acces extins la download, la instrumentele noastre de dimensionare și la evenimentele noastre.

Înregistraţi-vă acum
A BRUGG GROUP COMPANY
Statele Unite

Schwieberdingen

Holdergasse 24 - 28, 71701, Schwieberdingen, Germania
2016
Client
Private
Tehnologie
Henke und Partner GmbH, Ingenieurbüro für Geotechnik
Antreprenor
Bramm Bau GmbH
Obiect protejat
Clădire, Carieră / Mina
Protecţie împotriva coroziunii
GEOBRUGG SUPERCOATING®
Zonă stabilizată
700 m²
Înălţime pantă
40 m
Înclinaţie pantă
30 ° - 90 °
Expoziţie
Sud-vest
Alte aplicaţii instalate
Minerit / Tuneluri
Situația inițială

The apartment house Holdergasse, in Schwieberdingen (near Stuttgart) was built in a former stone quarry in the second half of the 20th century.  At that time, the stone walls were in a good condition.  The first rockfalls occurred some years ago, caused by weather conditions. Extremely loud impacts from rocks concerned the residents.

An initial assessment by the Henke and Partner in Stuttgart, showed that a full area support was necessary.  At the customer’s request, different measurements were evaluated. The comprehensive search for suitable solutions took about two years.  The solution proposed by Henke and Partner including TECCO® SYSTEM³, proved to be the most logical and economical application.

Geologie

Shell limestone

Descriere

The rock wall was divided into various areas of protection such as steep rock faces, overhanging formations, layered rocks with covered with with loose soils . Due to the tightness in some areas between the building and the rock face, a suitable solution had to be found here as well.

According to the dimensioning using RUVOLUM® software high tensile steel mesh type TECCO® 65/2 proved to be the most economical solution.

In some areas with overhangs, shotcrete filling had to be planned. The areas with loose rock were additionally covered with the anti-erosion protection mat TECMAT®. Areas where the distance to the building was less than one meter, extra lacing was implemented.
After completion, the initially skeptical residents were enthusiastic about the good adaptation to the terrain. The work was carried out by the company Bramm Bau GmbH.

Contactul dvs. local

Kevin H. Coyle
Kevin H. Coyle
Regional Manager Northeast
Natural Hazards
Geobrugg North America, LLC
3 Beaudet Terr
Columbia CT 06237 / Statele Unite
Telefon +1 860 377 3230

Formular de contact

Saleh Feidi
Saleh Feidi
Regional Manager California
Natural Hazards
Geobrugg North America, LLC
8921 Emperor Ave.
San Gabriel, California 91775 / Statele Unite
Telefon +1 909 706 8964

Formular de contact

John Kalejta
John Kalejta
Regional Manager Central US
Natural Hazards
Geobrugg North America, LLC
3215 67th Avenue Pl
Greeley CO 80634 / Statele Unite
Telefon +1 505 220 1404

Formular de contact

Bob Lyne
Bob Lyne
Regional Manager Southeast
Natural Hazards
Geobrugg North America, LLC
8004 Windspray Drive
Summerfield NC 27358 / Statele Unite
Telefon +1 336 337 0945

Formular de contact

Pierce Runnels, Civil Engineer
Pierce Runnels, Civil Engineer
General Manager Geobrugg North America
Natural Hazards
Geobrugg North America, LLC
22 Centro Algodones
Telefon +1 505 771 4080
Mobil +1 505 400 0796

Formular de contact

Tim Shevlin
Tim Shevlin
Sales Director
Natural Hazards
Geobrugg North America, LLC
4676 Commercial St. SE, PMB 174
Salem OR 97302 / Statele Unite
Telefon +1 503 423 7258

Formular de contact