Elveţia
Elveţia

myGeobrugg

Minerit / Tuneluri - Saint Beat (Haute Garonne) 2020

The first Attenuator System in France

Minerit / Tuneluri - Saint Beat (Haute Garonne) 2020

The attenuator extends over a length of 60 meters.

 

Sisteme

 

Anul instalării

2020

Situația inițială

The quarry, situated in the French Pyrenees, was affected by frequent rockfalls.

Descriere

An attenuator ATT 60 was installed to protect the endangered zone of the quarry. This attenuator is the first of its kind in France.

Post height: 4 meters
Width: 60 meters

Client

Tehnologie

Ginger-IMS RN St Gaudens (31)

Antreprenor

Gauthier SA

Obiect protejat

Carieră / Mina

Protecţie împotriva coroziunii

GEOBRUGG SUPERCOATING

Contactul dvs. local

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Industriestrasse 21,5200 Brugg / Elveţia Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Olivia Sartorius
   

Olivia Sartorius

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Elveţia Ticino Country Manager

E-mail