Elveţia
Elveţia

myGeobrugg

Hydraulic Power Plant Nihuil 2 - San Rafael

Protecţia împotriva căderilor de pietre - Hydraulic Power Plant Nihuil 2 - San Rafael 2019

This two-cubic-meter rock block was stopped

Protecţia împotriva căderilor de pietre - Hydraulic Power Plant Nihuil 2 - San Rafael 2019

The powerhouse of the Nihuil Hydraulic Power Plant

Protecţia împotriva căderilor de pietre - Hydraulic Power Plant Nihuil 2 - San Rafael 2019

Maintenance work on the INT rockfall barrier

Protecţia împotriva căderilor de pietre - Hydraulic Power Plant Nihuil 2 - San Rafael 2019

View of the A3S / RXI-100 barrier

 

Lungime sistem

10 m - 70 m

 

Anul instalării

2019

Situația inițială

The powerhouse of the Nihuil 2 Hydraulic Power Plant suffered from rock impacts coming down from the adjacent slopes. In 2007, 10 dynamic rockfall protection barriers were installed to protect the infrastructure.

Systems installed:
1) Barrier A1S: RXI-100. Capacity: 1000 kJ. Length: 10 m. Height: 3,0 m
2) Barrier A2S: RXI-100. Capacity: 1000 kJ. Length: 10 m. Height: 3,0 m
3) Barrier A3S: RXI-100. Capacity: 1000 kJ. Length: 40 m. Height: 3,0 m
4) Barrier B: RXI-150. Capacity: 1500 kJ. Length: 54 m. Height: 3,0 m
5) Barrier C1S: RXI-025. Capacity: 250 kJ. Length: 10 m. Height: 4,0 m
6) Barrier C2S: RXI-025. Capacity: 250 kJ. Length: 10 m. Height: 4,0 m
7) Barrier INF1: RXI-030. Capacity: 300 kJ. Length: 30 m. Height: 4,0 m
8) Barrier INF2: RXI-030. Capacity: 300 kJ. Length: 70 m. Height: 4,0 m
9) Barrier INT: RXI-100. Capacity: 1000 kJ. Length: 60 m. Height: 5,5 m
10) Barrier D1: RXI-075. Capacity: 750 kJ. Length: 20 m. Height: 4,0 m

Descriere

After a 5-ton block had hit the barrier, a general maintenance of all barriers was carried out in 2019. The works included:

- Cleaning the barriers
- Replacement of a ring net section, retaining cables, secondary meshes, and brakes
- Realignment of side post
- Fixation of cable ties

Client

Obiect protejat

Infrastructură

Protecţie împotriva coroziunii

Galvanized

Alte companii implicate

San Juan Vertical

Alte aplicaţii instalate

Protecţia împotriva căderilor de pietre

Contactul dvs. local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Industriestrasse 21,5200 Brugg / Elveţia Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Elveţia Ticino Country Manager

E-mail