Elveţia
Elveţia

myGeobrugg

Fierza Hydroelectric Power Station #3

Stabilizarea pantelor - Fierza Hydroelectric Power Station #3 2014

Slope protected with TECCO® G65/3 mesh and TECMAT®.

Stabilizarea pantelor - Fierza Hydroelectric Power Station #3 2014

Drilling work and nail installation.

Stabilizarea pantelor - Fierza Hydroelectric Power Station #3 2014

Drilling work and nails installation completed with a "Spider" machine.

Stabilizarea pantelor - Fierza Hydroelectric Power Station #3 2014

Installation using a drilling machine always requires a two-man crew.

Stabilizarea pantelor - Fierza Hydroelectric Power Station #3 2014

Slope protected with TECCO® G65/3 mesh and TECMAT®.

Stabilizarea pantelor - Fierza Hydroelectric Power Station #3 2014

TECCO® G65/3 high-tensile steel mesh is very light weight, allowing helicopter installation.

 

Anul instalării

2014

Situația inițială

Slope instability on the lake sides had to be stabilized.

Descriere

Slope stabilization with TECCO® System with TECCO® G65/3 mesh with TECMAT® for erosion control.

Stabilization of single boulder with SPIDER® S4-230 net.

Client

KESH Albania

Antreprenor

Cresta Geo Switzerland

Obiect protejat

Road, Clădire

Protecţie împotriva coroziunii

GEOBRUGG SUPERCOATING

Contactul dvs. local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Industriestrasse 21,5200 Brugg / Elveţia Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Elveţia Ticino Country Manager

E-mail