Elveţia
Elveţia

myGeobrugg

Protecţia împotriva căderilor de pietre - Cuenca - Molleturo - Km. 49 2023

Overall view of the project and the slope

Protecţia împotriva căderilor de pietre - Cuenca - Molleturo - Km. 49 2023

Rear of the berm and the barrier

Protecţia împotriva căderilor de pietre - Cuenca - Molleturo - Km. 49 2023

Rockfall barrier and slope stabilization system

Protecţia împotriva căderilor de pietre - Cuenca - Molleturo - Km. 49 2023

View of the GBE barrier, TECCO system, and the protected road

Protecţia împotriva căderilor de pietre - Cuenca - Molleturo - Km. 49 2023

Close-up view of mesh on the barrier

Protecţia împotriva căderilor de pietre - Cuenca - Molleturo - Km. 49 2023

Aerial view of the stabilizing mesh and the rockfall protection barrier

Protecţia împotriva căderilor de pietre - Cuenca - Molleturo - Km. 49 2023

Aerial view of the slope stabizliation system and the barrier

 

Lungime sistem

120 m

 

Anul instalării

2023

Situația inițială

A significant landslide and continuous rockfall were issues for the Cuenca-Molleturo road at km 49. Rockfall and landslide protection were necessary for the safety of the road. Thus, the Ministry of Transportation and Public Works carried out a large-scale project to stabilize the slope with terraces.


Descriere

In addition to the terraces, TECCO mesh prevents surface landslides, and a dynamic rockfall protection barrier will hold back future rockfall. 

Geobrugg and Pivaltec S.A. supplied a GBE-100A-R rockfall barrier with a total length of 120 meters and a TECCO G65/3 system covering an area of 2800 m².

Client

MTOP - Ministerio de Transportes y Obras Publicas

Obiect protejat

Road

Protecţie împotriva coroziunii

GEOBRUGG SUPERCOATING

Alte aplicaţii instalate

Stabilizarea pantelor

Contactul dvs. local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Industriestrasse 21,5200 Brugg / Elveţia Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Elveţia Ticino Country Manager

E-mail