Elveţia
Elveţia

myGeobrugg

Ausserfernbahn Ehrenberg near Reutte, Austrian Railway ÖBB

Protecţia împotriva căderilor de pietre - Ausserfernbahn Ehrenberg near Reutte, Austrian Railway ÖBB 2015

RXE-500 rockfall barrier fully installed along the railway line

Protecţia împotriva căderilor de pietre - Ausserfernbahn Ehrenberg near Reutte, Austrian Railway ÖBB 2015

Due to the demanding terrain, transport by helicopter was necessary at all stages of the building process

Protecţia împotriva căderilor de pietre - Ausserfernbahn Ehrenberg near Reutte, Austrian Railway ÖBB 2015

Precast RXE-500 supports awaiting transport by helicopter

Protecţia împotriva căderilor de pietre - Ausserfernbahn Ehrenberg near Reutte, Austrian Railway ÖBB 2015

Even concrete elements were made to measure – a special solution for this difficult-to-access construction site

Protecţia împotriva căderilor de pietre - Ausserfernbahn Ehrenberg near Reutte, Austrian Railway ÖBB 2015

Precast concrete elements, ground plates, and post connection

Protecţia împotriva căderilor de pietre - Ausserfernbahn Ehrenberg near Reutte, Austrian Railway ÖBB 2015

Rows 3 and 4 – both with a custom rock face connection

Protecţia împotriva căderilor de pietre - Ausserfernbahn Ehrenberg near Reutte, Austrian Railway ÖBB 2015

Line 1 of the RXE-500 rockfall barrier fully installed - visible support rope separation after 50 meters of the barrier, executed on the post no. 6 (counting from the end on the picture)

Protecţia împotriva căderilor de pietre - Ausserfernbahn Ehrenberg near Reutte, Austrian Railway ÖBB 2015

View of the support with carrier separation

Protecţia împotriva căderilor de pietre - Ausserfernbahn Ehrenberg near Reutte, Austrian Railway ÖBB 2015

Carrier separation with brake elements on the post head saves on two anchoring points at ground level. Carrier separation on the post head also enhances safety, as it is installed at height and thus protected from rockfall.

Protecţia împotriva căderilor de pietre - Ausserfernbahn Ehrenberg near Reutte, Austrian Railway ÖBB 2015

An RXE-500 barrier protects the tunnel entrance

Protecţia împotriva căderilor de pietre - Ausserfernbahn Ehrenberg near Reutte, Austrian Railway ÖBB 2015

The RXE-500 rockfall barrier protects not only the railway, but also the major mountain road B179, and the site of Burgenwelt Ehrenberg

Protecţia împotriva căderilor de pietre - Ausserfernbahn Ehrenberg near Reutte, Austrian Railway ÖBB 2015

View of the installed RXE-500 barrier

 

Sisteme

 

Lungime sistem

13 m - 100 m

 

Anul instalării

2015

Situația inițială

Within the concept of "The Rehabilitation of the Karwendel and Ausserfernbahn – A Railway for Mobility", the line was further protected from natural disasters in 2015.

Since its commissioning in 1912/13 as the first completely electrical railway in the former Monarchy of Austria–Hungary, the line has now developed into a popular railway. Today, the route is considered a premier historical landmark, with early Alpine railways, numerous railway buildings, bridge structures, and a natural stone tunnel having protected status.

Due to damage from storms and harsh winters, the section between the tunnel portal, above the site of the Burgenwelt Ehrenberg castle and mountain road B179, was likely to be struck by rockfall.

As far as tourism and infrastructure are concerned, a secure railway connection between Ausserfern-Reutte and Innsbruck is of huge importance.

Descriere

Four RXE-500 rockfall barriers were installed to protect the railway line, the B179 road running directly below, part of the area of the Burgenwelt Ehrenberg tourist site, and the highline179 pedestrian bridge against falling rocks, blocks, and trees.

A double-walled enclosure of just 13 meters connected to the rock secures the tunnel portal. Three rows of RXE-500 run parallel to the track, with a total length of 207 meters. All barriers were designed with an overall height of 3.5 meters. A series of cables, with a length of 100 meters, has a carrier separation with intermediate suspension after 50 meters. This adheres to the requirements set out by the ONR (Austrian Standards).

Due to its exposed position, the task of carrying all construction site equipment and the installation of the RXE barrier had to be undertaken by helicopter.

Client

Austrian Railway Infrastructure - ÖBB-Infrastruktur AG

Antreprenor

Hilti & Jehle GmbH

Obiect protejat

Road, Calea ferata, Clădire, infrastructura turistică, Infrastructură

Protecţie împotriva coroziunii

Galvanized, GEOBRUGG SUPERCOATING

Tehnologie

ÖBB-Infrastruktur AG

Contactul dvs. local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG,Industriestrasse 21,5200 Brugg / Elveţia Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Elveţia Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Inginerie hidraulică
Minerit / Tuneluri
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Elveţia Ticino Country Manager

E-mail