Suíça
Suíça

myGeobrugg

Estabilização de taludes - Waiheke Island (1) 2018

View from above - TECCO® STAINLESS G65/3 with stainless P33/50 spike plates - Note tree holes and proximity to the sea

Estabilização de taludes - Waiheke Island (1) 2018

View from above - TECCO® STAINLESS G65/3 with stainless P33/50 spike plates - Note tree holes

 

Ano de instalação

2018

Situação inicial

Erosion and subsequent slumping of the slope below a coastal property required a corrosion resistant solution to actively support the slope and prevent further undercutting. The rehabilitation area was 600 m².

Descrição

The mesh selected was TECCO® STAINLESS G65/3 due to its strength properties, superior corrosion resistance (stainless), low visibility, uniform strength for anchor placement and speed of installation. The TECCO® SYSTEM also allowed tree holes to be cut for planting of the slope.

Promotor

Private

Contratante

Groundfix

Objecto protegido

Edifício

Proteção contra a corrosão

INOX / STAINLESS

O seu contacto local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Riscos naturais
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suíça Ticino Country Manager

E-mail