Suíça
Suíça

myGeobrugg

Estabilização de taludes - Palena 2003

.

Estabilização de taludes - Palena 2003

Details of the anchorage plate

Estabilização de taludes - Palena 2003

Details of the TECCO® mesh

Estabilização de taludes - Palena 2003

Location of the bank at the completion of works

Estabilização de taludes - Palena 2003

Stabilized bank with the TECCO® mesh

Estabilização de taludes - Palena 2003

Bank revegetation

Estabilização de taludes - Palena 2003

Details of the revegetated bank

Estabilização de taludes - Palena 2003

Condition of the bank after the flow surges

Estabilização de taludes - Palena 2003

System drawing

 

Ano de instalação

2003

Situação inicial

The stretch of embankment in question was long since subject to erosion problems because of the presence of nonlinear stretches in correspondence with the material removal, in case of signifi cant fl ows. This involved problems of poor stability for the road above and for the buildings that were immediately behind.

Descrição

The TECCO® choice by the design engineer was made for various reasons of which we should mention the high-tensile steel wire TECCO® mesh unit (high tensile 1770 N/mm2); the special anticorrosive treatment with aluminium-zinc alloy (GEOBRUGG SUPERCOATING); and the high bearing resistance of the mesh, by applying tension to it with the penetration of the special TECCO® cuspate shaped plates for the distribution of the anchorage loads in the bank's soil. These elements guaranteed by the TECCO® System are not present in the traditional bank protection method with gabions. Furthermore, the
particularly fast timeline for the implementation of the TECCO® System played a major part given that the work was done late in the season.

País / Região

Itália

Promotor

Municipality of Palena

Empreteiro

Dr. Ing. Alessandro Marini

Contratante

CO.GE.PRI. srl - PIaneta Montagna

Objecto protegido

Estrada, Edifício

O seu contacto local

René Müller
   

René Müller

Country Manager Western Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / Suíça Country Manager Western Switzerland

E-mail

Olivia Sartorius
   

Olivia Sartorius

Country Manager Eastern and Central Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Country Manager Eastern and Central Switzerland

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suíça Country Manager Southern Switzerland

E-mail