Suíça
Suíça

myGeobrugg

Proteção contra correntes de detritos - Montecito 2019

Completed flexible debris flow barrier - Picture: Kane Geotech

Proteção contra correntes de detritos - Montecito 2019

Completed flexible debris flow barrier - Picture: Kane Geotech

Proteção contra correntes de detritos - Montecito 2019

Installed flexible debris flow barrier - The overall footprint of the constructed net is relatively small. Picture: Kane Geotech

Proteção contra correntes de detritos - Montecito 2019

Installation of a flexible debris flow barrier. Picture: Kane Geotech

Proteção contra correntes de detritos - Montecito 2019

Filled barrier in San Ysidro Canyon in January 2023. Picture: Santa Barbara Independent

Proteção contra correntes de detritos - Montecito 2019

Installed flexible debris flow barrier - A large basal opening allows fish and wildlife passage. Picture: Kane Geotech

Proteção contra correntes de detritos - Montecito 2019

Montecito endured catastrophic flooding and debris flow following a strong rainstorm in the early morning hours of January 9, 2018: https://www.montecitojournal.net/2018/12/27/the-year-in-review-2018/

 

Sistemas

VX VX160-H6 Soluções especiais

 

Comprimento do sistema

17 m - 25 m

 

Ano de instalação

2019

Situação inicial

Description by Gurrola and Rogers (2022): The 1-9 debris flow event was preceded by the Thomas Fire, which started in Ventura County on December 5, 2017, and, due to Santa Ana wind conditions, quickly burned westward into the watersheds of Montecito and Carpinteria. Three weeks after the wildfire decimated the vegetation of the Montecito watersheds, a narrow, cold front on January 9, 2018, triggered post-fire debris flows that devastated the community of Montecito (Lancaster et al., 2021; Kean et al., 2019; Lukashov et al., 2019).

The 1-9 event resulted in twenty-three (23) fatalities, damaged or destroyed over 500 homes, damaged infrastructure, including closing Highway 101 for thirteen days, and caused an estimated billion dollars in economic losses (Lancaster et al., 2021; County of Santa Barbara OEM, 2018; Niehaus, 2018 and 2019; Kean et al., 2019).

More information can be found in the following report by Gurrola and Rogers (2022): https://www.tprcsb.org/_files/ugd/056f9d_0230d73eec4b41829cfc6368e3dadda0.pdf

Descrição

Six Geobrugg flexible debris flow nets have been installed in San Ysidro, Buena Vista, and Cold Springs Canyons. The construction was closely monitored by a supervising biologist, a geologist, and a geo-tech engineer to ensure that the environmental conditions of the building permits and authorizations from the multiple governmental agencies were carefully maintained (https://www.tprcsb.org/nets).

In Cold Springs Canyon, a VX160-H6 and a specially adapted VX-barrier were installed with a total retention capacity of 9'650 CY / 7'378 m3. With these two flexible barriers, the retention capacity of the existing debris basin from 1964 is nearly doubled.

In San Ysidro Canyon, two specially adapted VX-barrier were installed with a total retention capacity of 15'950 CY / 12'200 m3. These barriers add nearly 200% to the existing debris basin at the mouth of the canyon, built in 1964.

In Buena Vista Canyon, two of the seven permitted flexible barriers have been installed so far. These are a specially adapted VX-barrier and a VX160-H6 with a total retention capacity of 11'700 CY / 8'950 m3. Buena Vista Canyon has no other retention capacity so far.

Objecto protegido

Estrada, Edifício, Área residencial, Infra-estrutura

Proteção contra a corrosão

GEOBRUGG SUPERCOATING

O seu contacto local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Riscos naturais
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suíça Ticino Country Manager

E-mail