Suíça
Suíça

Moffet Creek, Oregon, T35 barrier on concrete guardrail

I-84 MP 37.5 East Bound, 97014, near Moffet Creek, Oregon, Estados Unidos
2018
Promotor
Triptych Constructon
Empreteiro
Oregon Department of Transportation
Contratante
Triptych Construction
Objecto protegido
Estrada
Absorção de energia máxima
35 kJ
Altura do sistema
2.0 m
Comprimento do sistema
- 100 m
Proteção contra a corrosão
GEOBRUGG SUPERCOATING
Outras aplicações instaladas
Estabilização de taludes, Road fencing
Situação inicial

After the severe 2018 Eagle Creek fire, a T35 rockfall barrier was utilized for temporary rockfall protection for the I-84 interstate during a larger scaling operation and TECCO® drape installation. Triptych Construction in conjunction with the Oregon Department of Transportation utilized Geobrugg North America's novel modification attaching the standard low energy T35 rockfall barrier to common concrete guardrail. 

Descrição

The T35 system is independently tested in 1:1 full-scale test for rockfall up to 35 kJ providing easy to install, cost-effective rockfall protection. The standard post has been redesigned to attach to standard concrete guardrail and available for quick supply and installation by qualified contractors.  

O seu contacto local

Roger Moor
Roger Moor
Country Manager Ost- und Zentralschweiz, Liechtenstein
Riscos naturais, Coastal Erosion Protection, Mineração / Túneis
Geobrugg AG
Aachstrasse 11
8590 Romanshorn / Suíça
Telefone 071 466 81 52
Telemóvel 078 783 46 81

E-mail

René Müller
René Müller
Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS
Riscos naturais, Mineração / Túneis
Geobrugg AG
Industriestrasse 21
5200 Brugg / Suíça
Isacco Toffoletto
Isacco Toffoletto
Ticino Country Manager
Riscos naturais, Mineração / Túneis
Geobrugg AG Ticino
Stabile Cometal, via Pizzante 7
6595 Riazzino / Suíça