Estabilização de taludes - Maconde Cliff 2023

Installation of the drape system.

Estabilização de taludes - Maconde Cliff 2023

Installation of the mesh with the help of a rope access worker.

Estabilização de taludes - Maconde Cliff 2023

Lateral view of the TECCO mesh.

Estabilização de taludes - Maconde Cliff 2023

Transport of the mesh roll with the crane.

Estabilização de taludes - Maconde Cliff 2023

Rolling down the TECCO mesh.

Estabilização de taludes - Maconde Cliff 2023

The TECCO mesh blends in well with the surrounding.

 

Ano de instalação

2023

Situação inicial

On the South coast of Mauritius, at Maconde Cliff, a famous tourist attraction, many unstable rocks needed to be secured. The biggest problems were some major horizontal joints, weathered rocks and the presence of discontinuities along large rocks. The cliff is 30 metres high and 175 metres long with an inclination of 85 degrees.

Descrição

After a site visit, we prepared a preliminary design proposal with the use of the RUVOLUM Tool. 

To prevent slope failures and falling rocks several sections required an active and passive slope stabilization system. The active being the TECCO System and the passive one being the drape system.

Both systems used to stabilize the cliff were made from TECCO G65/3 STAINLESS steel mesh.

 

A big thank you to Yannick Labonne from Acrocha CO LTD for the stunning pictures. 

País / Região

Maurícia

Empreteiro

Contratante

Outras empresas envolvidas

Objecto protegido

Estrada, Infra-estrutura turística

Proteção contra a corrosão

INOX / STAINLESS

O seu contacto local

René Müller
   

René Müller

Country Manager Western Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Western Switzerland

E-mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG Project Manager Sales Eastern Switzerland

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Riscos naturais
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / Suíça Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Suíça Country Manager Southern Switzerland

E-mail