Little Orme 2019 - Geobrugg Little Orme 2019 - Geobrugg
Little Orme 2019 - Geobrugg Little Orme 2019 - Geobrugg
Little Orme 2019 - Geobrugg Little Orme 2019 - Geobrugg
Little Orme 2019 - Geobrugg Little Orme 2019 - Geobrugg
Little Orme 2019 - Geobrugg Little Orme 2019 - Geobrugg
Little Orme 2019 - Geobrugg Little Orme 2019 - Geobrugg
Little Orme 2019 - Geobrugg Little Orme 2019 - Geobrugg

Little Orme

   Compartilhar
Rua
Colwyn Road B5115
Código postal
LL30 3AL
Lugar
Wales
País / Região
Reino Unido
Ano de instalação
2019
Cliente
North Wales Wildlife Trust
Engenharia
Daear Geo Consulting
Contratante:
Colin Jones (Rock Engineering) LTD
Objecto protegido
Estrada, Edifício, Infra-estrutura turística
Sistemas
SPIDER® S3-130
Protecção contra a corrosão
GEOBRUGG SUPERCOATING®
Área estabilizada
100 m²
Exposição
Sul
Geologia

The Little Orme is comprised of limestone with sub-horizontal bedding planes.
The jointing is orthogonal, defining large blocks. Generally, these joints are tight within the rock mass, however, due to weathering and block movement, they are often dilated on the rock face.

The limestone is made up of individual beds of varying composition, with a resulting variation in strength and resistance to weathering. As such the exposed faces display evidence of differential weathering rates. Horizons which are more prone to weathering will undermine overlying beds.

Over time the limestone blocks above will become unstable and will begin to topple forward, resulting in natural joints opening further. Eventually, the blocks will be displaced, and the process will start again.

Situação inicial

Following the routine inspection of the rock face by Colin Jones Rock Engineering LTD it was noted that a few blocks needed further inspection to ensure the safety of road and footpath users on the B5115 Colwyn Road. Daear Geo Consulting (DGC) was asked to undertake IRATA inspections of the blocks. In June 2018 DGC completed the field inspection and reported that the blocks pose a rockfall risk.

The consequences of the blocks failing are likely to be severe, with the blocks traveling at high velocity to the base of the slope with a very high likelihood of crashing through the masonry wall and onto the road or the hotel premises beyond.

The rockfall, therefore, posed a risk to users of the footpath that traverses the slope.

Descrição

From the Daear Geo Consulting's assessment, three options were possible, removal of the blocks, stabilisation of the blocks or protection of infrastructure. Between DGC and Geobrugg it was agreed that the best solution would be to stabilise the blocks. Geobruggs SPIDER® ONLINE-TOOL was used to model the blocks and to confirm the requirements of bolt spacing and bolt length along with confirmation of the mesh type.

Geotechnical specialists Colin Jones (Rock Engineering) LTD decided upon a safe system of work, methodology, and equipment to undertake the site works. Using 25 mm bar into a 42 mm diameter drilled hole secured with resin capsules. The anchor bar depth was between 2.5 and 3 m into competent limestone. Drilling of all seven bolts was undertaken with handheld drill rig.

O seu contacto local

Kevin H. Coyle
Kevin H. Coyle
Regional Manager Northeast
Riscos naturais
Geobrugg North America, LLC
3 Beaudet Terr
Columbia CT 06237 / Estados Unidos
Telefone +1 860 377 3230

Formulário de contacto

Saleh Feidi
Saleh Feidi
Regional Manager California
Riscos naturais
Geobrugg North America, LLC
8921 Emperor Ave.
San Gabriel, California 91775 / Estados Unidos
Telefone +1 909 706 8964

Formulário de contacto

John Kalejta
John Kalejta
Regional Manager Central US
Riscos naturais
Geobrugg North America, LLC
3215 67th Avenue Pl
Greeley CO 80634 / Estados Unidos
Telefone +1 505 220 1404

Formulário de contacto

Bob Lyne
Bob Lyne
Regional Manager Southeast
Riscos naturais
Geobrugg North America, LLC
8004 Windspray Drive
Summerfield NC 27358 / Estados Unidos
Telefone +1 336 337 0945

Formulário de contacto

Pierce Runnels, Civil Engineer
Pierce Runnels, Civil Engineer
General Manager Geobrugg North America
Riscos naturais
Geobrugg North America, LLC
22 Centro Algodones
Telefone +1 505 771 4080
Telemóvel +1 505 400 0796

Formulário de contacto

Tim Shevlin
Tim Shevlin
Sales Director
Riscos naturais
Geobrugg North America, LLC
4676 Commercial St. SE, PMB 174
Salem OR 97302 / Estados Unidos
Telefone +1 503 423 7258

Formulário de contacto