Estabilização de taludes - Dartford Greenhithe 2022

Aerial view of final installation

Estabilização de taludes - Dartford Greenhithe 2022

TECCO installation

Estabilização de taludes - Dartford Greenhithe 2022

Smaller first section of works

 

Ano de instalação

2022

Situação inicial

Following the instability of several areas of chalk cliff face adjacent to London Road, RSK was appointed as a designer to assess the slope instability and form a remediation strategy for the area. Risk areas were the footpath running along the base of the site as well as London Road atop the cliff with undermining of the road a possibility if protective measures were not put in place.

Geologia

Lewes Nodular Chalk Formation

Descrição

The site was divided up into three sections, the first was a smaller mound of limestone approximately 8 metres in height, 15 metres wide and made up of three visible sides, rock bolted and meshed using TECCO G65/3 and TECCO GREEN. 

The main section of works comprised the cliff directly below London Road, the chalk in this area was around 20 metres in height, with the section running almost 100 metres. Drilling conditions on site were generally good with no flint bands present in the limestone, and a combination of grout and air flush was used. In total 630 holes were drilled across the site.

CAN Ltd was appointed as the contractor responsible for installation of the protective measures

País / Região

Reino Unido

Promotor

Empreteiro

RSK

Contratante

Objecto protegido

Estrada, Área residencial

Proteção contra a corrosão

GEOBRUGG SUPERCOATING

O seu contacto local

René Müller
   

René Müller

Country Manager Western Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Western Switzerland

E-mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG Project Manager Sales Eastern Switzerland

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Riscos naturais
Monitoring
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / Suíça Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Suíça Country Manager Southern Switzerland

E-mail