Proteção contra desprendimentos - Danielsberg 2019

The rockfall protection system after completion

Proteção contra desprendimentos - Danielsberg 2019

The infrastructure endangered by the rocks (top right in the picture)

Proteção contra desprendimentos - Danielsberg 2019

A crane places the huge posts onto the base plates

Proteção contra desprendimentos - Danielsberg 2019

All posts have been erected, afterwards the the suspension ropes get installed

Proteção contra desprendimentos - Danielsberg 2019

The 112 meter long barrier was realized with a support rope separation

Proteção contra desprendimentos - Danielsberg 2019

Once the transmission ropes have been installed, the nets are unfolded

Proteção contra desprendimentos - Danielsberg 2019

The buildings are located directly in the hazard zone

Proteção contra desprendimentos - Danielsberg 2019

The net bundles are hanging on the support rope, ready to unfold

Proteção contra desprendimentos - Danielsberg 2019

The ring nets are connected with shackles

Proteção contra desprendimentos - Danielsberg 2019

View from the east to the completed rockfall barrier

Proteção contra desprendimentos - Danielsberg 2019

Overview of the RXE-10000 system at Danielsberg

Proteção contra desprendimentos - Danielsberg 2019

The rockfall protection system after completion

 

Sistemas

 

Comprimento do sistema

- 112 m

 

Ano de instalação

2019

Situação inicial

Buildings and the main road into the Mölltal (Danielsberg) were regularly affected by rockfall. During the planning of hazard zones, geological surveys also identified a substantial rockfall risk for the future. The expected rock falls require constructions that can absorb the highest energies.

Various solutions for protecting the infrastructure were considered. An earth dam, for example, was not an option due to the limited space available.

Video of the installation

Descrição

Amongst the flexible rockfall barriers, only the Geobrugg RXE-10000 with an energy absorption capacity of over 10,000 kJ met the requirements in terms of energy absorption capacity. The area occupied by the barrier is relatively small.

This is the first rockfall protection project worldwide with a capacity of 10,000 kJ. The RXE-10000 system was certified in 2018.

Promotor

Wildbach- und Lawinenverbauung

Contratante

Wildbach- und Lawinenverbauung

Objecto protegido

Estrada, Edifício, Área residencial, Infra-estrutura

Proteção contra a corrosão

GEOBRUGG ULTRACOATING

Empreteiro

Wildbach- und Lawinenverbauung, IBG-ZT GmbH, Geobrugg

O seu contacto local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Riscos naturais
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suíça Ticino Country Manager

E-mail