Suíça
Suíça

myGeobrugg

Estabilização de taludes - Cuenca - Molleturo - Km. 49 2023

Overall view of the project and the slope

Estabilização de taludes - Cuenca - Molleturo - Km. 49 2023

Rear of the berm and the barrier

Estabilização de taludes - Cuenca - Molleturo - Km. 49 2023

Rockfall barrier and slope stabilization system

Estabilização de taludes - Cuenca - Molleturo - Km. 49 2023

View of the GBE barrier, TECCO system, and the protected road

Estabilização de taludes - Cuenca - Molleturo - Km. 49 2023

Close-up view of mesh on the barrier

Estabilização de taludes - Cuenca - Molleturo - Km. 49 2023

Aerial view of the stabilizing mesh and the rockfall protection barrier

Estabilização de taludes - Cuenca - Molleturo - Km. 49 2023

Aerial view of the slope stabizliation system and the barrier

 
 

Ano de instalação

2023

Situação inicial

A significant landslide and continuous rockfall were issues for the Cuenca-Molleturo road at km 49. Rockfall and landslide protection were necessary for the safety of the road. Thus, the Ministry of Transportation and Public Works carried out a large-scale project to stabilize the slope with terraces.


Descrição

In addition to the terraces, TECCO mesh prevents surface landslides, and a dynamic rockfall protection barrier will hold back future rockfall. 

Geobrugg and Pivaltec S.A. supplied a GBE-100A-R rockfall barrier with a total length of 120 meters and a TECCO G65/3 system covering an area of 2800 m².

País / Região

Equador

Promotor

MTOP - Ministerio de Transportes y Obras Publicas

Objecto protegido

Estrada

Proteção contra a corrosão

GEOBRUGG SUPERCOATING

O seu contacto local

René Müller
   

René Müller

Country Manager Western Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Western Switzerland

E-mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Monitoring
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suíça Country Manager Southern Switzerland

E-mail