Borusan EnBW

Ispir Erzurum, Turquia
2019
Promotor
Borusan EnBW
Empreteiro
Geobrugg AG
Contratante
Artusa Geohazard
Objecto protegido
Outros
Altura do sistema
6.0 m
Comprimento do sistema
15 m
Proteção contra a corrosão
GEOBRUGG SUPERCOATING®
Número de barreiras
1
Capacidade de retenção
3000 m³
Situação inicial

At the hydro power plant infrastructure in 2011 and 2017 torrents brought down debris and clogged culverts of the draining system.  Around 5'000 m³ of debris damaged the HPP area.

Descrição

At the ideal place for this debris flow barrier, there also is an area for debris material nearby. The system is a V-shaped, 6 meters high barrier (VX160-H6) with 8 meters deep wire rope anchors.

O seu contacto local

Roger Moor
Roger Moor
Ost- und Zentralschweiz, Liechtenstein - Country Manager
Riscos naturais, Mineração / Túneis
Geobrugg AG
Aachstrasse 11
8590 Romanshorn / Suíça
René Müller
René Müller
Country Manager Western Switzerland (AG, BE, BL, BS, FR, GE, JU, NE, SO, VD, VS)
Riscos naturais, Mineração / Túneis
Geobrugg AG
Industriestrasse 21
5200 Brugg / Suíça
Isacco Toffoletto
Isacco Toffoletto
Country Manager Southern Switzerland (TI)
Riscos naturais, Mineração / Túneis
Geobrugg AG
Via Pizzante 7
6595 Riazzino / Suíça
Jonas von Wartburg
Jonas von Wartburg
Country Manager Western Switzerland/Scandinavia
Riscos naturais, Mineração / Túneis
Geobrugg AG
Aachstrasse 11
8590 Romanshorn / Suíça