Bont Evans Tree Works Scheme 2018 - Geobrugg Bont Evans Tree Works Scheme 2018 - Geobrugg
Bont Evans Tree Works Scheme 2018 - Geobrugg Bont Evans Tree Works Scheme 2018 - Geobrugg
Bont Evans Tree Works Scheme 2018 - Geobrugg Bont Evans Tree Works Scheme 2018 - Geobrugg
Bont Evans Tree Works Scheme 2018 - Geobrugg Bont Evans Tree Works Scheme 2018 - Geobrugg
Bont Evans Tree Works Scheme 2018 - Geobrugg Bont Evans Tree Works Scheme 2018 - Geobrugg
Bont Evans Tree Works Scheme 2018 - Geobrugg Bont Evans Tree Works Scheme 2018 - Geobrugg
Bont Evans Tree Works Scheme 2018 - Geobrugg Bont Evans Tree Works Scheme 2018 - Geobrugg
Bont Evans Tree Works Scheme 2018 - Geobrugg Bont Evans Tree Works Scheme 2018 - Geobrugg
Bont Evans Tree Works Scheme 2018 - Geobrugg Bont Evans Tree Works Scheme 2018 - Geobrugg
Bont Evans Tree Works Scheme 2018 - Geobrugg Bont Evans Tree Works Scheme 2018 - Geobrugg

Bont Evans Tree Works Scheme

   Compartilhar
Rua
A487 Goedwig Corris
Código postal
SY20 9AT
Lugar
Machynlleth
País / Região
Reino Unido
Ano de instalação
2018
Cliente
Natural Resources Wales
Engenharia
CAULMERT
Contratante:
Colin Jones Rock Engineering Ltd
Objecto protegido
Estrada, Infra-estrutura turística
Sistemas
GBE-100A-R
Absorção de energia máxima
100 kJ
Altura do sistema
2.0 m
Comprimento do sistema
930 m
Protecção contra a corrosão
Galvanizado, GEOBRUGG SUPERCOATING®
Situação inicial

Natural resource Wales need to clear the hillside of trees that have grown too tall and create a safety concern for road users, hill walkers, and tourists. During early stage investigation, many rock outcrops were found on site and concerns were raised of potential rockfall created during the tree harvesting process. The harvesting is undertaken by, and this involves the lifting and dragging of the cut tree to the stockpile. Potentially dislodging rock and debris in the process.

Descrição

Working alongside Caulmert we were able to supply experience and materials to this complex build and provide a temporary rockfall fence along the full road boundary of the site.

Colin Jones Rock Engineering stalled the GBE-100A-R of two m in height. The ground anchors are IBO R32 bar to depths of 2.5 m. Where rock head was not at surface the fence post bases are constructed of 1000 x 500 x 400 triple reinforced concrete bases. A combination of Geobrugg Type III wire rope anchors or Geobrugg Flexheads for IBO R32 bar drilled to depths of 4.5 m.

O seu contacto local

Kevin H. Coyle
Kevin H. Coyle
Regional Manager Northeast
Riscos naturais
Geobrugg North America, LLC
3 Beaudet Terr
Columbia CT 06237 / Estados Unidos
Telefone +1 860 377 3230

Formulário de contacto

Saleh Feidi
Saleh Feidi
Regional Manager California
Riscos naturais
Geobrugg North America, LLC
8921 Emperor Ave.
San Gabriel, California 91775 / Estados Unidos
Telefone +1 909 706 8964

Formulário de contacto

John Kalejta
John Kalejta
Regional Manager Central US
Riscos naturais
Geobrugg North America, LLC
3215 67th Avenue Pl
Greeley CO 80634 / Estados Unidos
Telefone +1 505 220 1404

Formulário de contacto

Bob Lyne
Bob Lyne
Regional Manager Southeast
Riscos naturais
Geobrugg North America, LLC
8004 Windspray Drive
Summerfield NC 27358 / Estados Unidos
Telefone +1 336 337 0945

Formulário de contacto

Pierce Runnels, Civil Engineer
Pierce Runnels, Civil Engineer
General Manager Geobrugg North America
Riscos naturais
Geobrugg North America, LLC
22 Centro Algodones
Telefone +1 505 771 4080
Telemóvel +1 505 400 0796

Formulário de contacto

Tim Shevlin
Tim Shevlin
Sales Director
Riscos naturais
Geobrugg North America, LLC
4676 Commercial St. SE, PMB 174
Salem OR 97302 / Estados Unidos
Telefone +1 503 423 7258

Formulário de contacto