myGeobrugg
Since its foundation in 1922, the historic Autodromo Nazionale Monza has constantly been renewing itself to keep up with the demands of the motoring world. This year, safety upgrades were requested to protect marshals’ posts, tv broadcast locations, and two sections running over tunnels and underneath pedestrian bridges.
Our U-shaped concrete barriers, designed to hold our debris fence panels, have been placed at seven marshal post locations. In addition, one marshal post system has been adapted to protect the tv camera crew by using a debris fence panel with a specific flexible opening instead of the two exit openings.
We also installed two 40 meters sections of our mobile debris fence along the straight between Ascari and Parabolica to replace the old guardrail and fence over the two tunnels and underneath the pedestrian bridges.