İsviçre
İsviçre

myGeobrugg

Kaya düşmesine karşı koruma - Diana Falls 2014

.

Kaya düşmesine karşı koruma - Diana Falls 2014

.

Kaya düşmesine karşı koruma - Diana Falls 2014

.

Kaya düşmesine karşı koruma - Diana Falls 2014

.

Kaya düşmesine karşı koruma - Diana Falls 2014

.

Kaya düşmesine karşı koruma - Diana Falls 2014

.

Kaya düşmesine karşı koruma - Diana Falls 2014

.

Kaya düşmesine karşı koruma - Diana Falls 2014

.

Kaya düşmesine karşı koruma - Diana Falls 2014

.

 

Sistem uzunluğu

40 m - 60 m

 

Kurulum Yılı

2014

Durum

Heavy rain cause a 40'000 cubic metre slip to completely close SH6 for several weeks in September 2013. Once cleared the road remained closed at night due to the continued high risk of rockfall from over 250 m up the slip face. Some of the unstable rocks were larger than 20 foot shipping containers.

Açıklama

Geovert was awarded the contract to design and build a bespoke rockfall protection solution above the State Highway to actively control the frequent high energy rockfalls. The best solution for the site was the construction of a 5m high 3000 kJ and two 6 m high 5000 kJ Geobrugg attenuator barriers. The 3000 kJ system was installed over 250m above the highway, the first of the 5000 kJ system was installed 150 m up and the final and largest barrier was installed around 50 m above the road. The bottom rockfall attenuator was a massive structure with a 35 t high tensile steel ROCCO ring net drape to control and channel the falling rocks and debris to the roadside for the maintenance crew to clear.

Watch the clip of NZTransportAgency

Müşteri

NZTA

Yüklenici

Opus & Sicon Fergusson

Gösterilen obje

Road

Mühendislik

Geovert

Yerel yetkiliniz

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Country Manager Ost- und Zentralschweiz, Liechtenstein

e-posta

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / İsviçre Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

e-posta

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Project Manager Inspection Services

e-posta

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / İsviçre Ticino Country Manager

e-posta