Port St Johns Dam Wall Abutment

비탈면 보강 시스템 - Port St Johns Dam Wall Abutment 2018

Stabilized slope

비탈면 보강 시스템 - Port St Johns Dam Wall Abutment 2018

Works at the steep slope

비탈면 보강 시스템 - Port St Johns Dam Wall Abutment 2018

View from the dam to the slope during installation works

 
 

Year of installation

2018

Situation

To prevent the possible collapse of rock onto the upstream abutment face of the dam wall, Geobrugg offered a slope stabilization with its TECCO® mesh.

Geology

Moderately to highly weathered tillite with closely spaced joints.  The rockmass is prone to ongoing disintegration on exposure to the elements.

Description

After site investigations, a solution with TECCO® mesh was chosen. The mesh is covering an area five meters above the final dam wall height, and eight meters below the full supply level, 15 meters wide at each side of the bullnose.

Customer

Alpinist Safety Consultants

Contractor

Alpinist Safety Consultants

Protected object

Infrastructure, Other

Corrosion protection

GEOBRUGG SUPERCOATING

Engineering

MSJ Geotechnical Consulting Services

Other installed applications

비탈면 보강 시스템

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

자연 재해
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 스위스 Ticino Country Manager

E-Mail