Port St Johns Dam Wall Abutment

边坡稳定 - Port St Johns Dam Wall Abutment 2018

Stabilized slope

边坡稳定 - Port St Johns Dam Wall Abutment 2018

Works at the steep slope

边坡稳定 - Port St Johns Dam Wall Abutment 2018

View from the dam to the slope during installation works

 

安装年份

2018

情况

To prevent the possible collapse of rock onto the upstream abutment face of the dam wall, Geobrugg offered a slope stabilization with its TECCO® mesh.

地質學

Moderately to highly weathered tillite with closely spaced joints.  The rockmass is prone to ongoing disintegration on exposure to the elements.

描述

After site investigations, a solution with TECCO® mesh was chosen. The mesh is covering an area five meters above the final dam wall height, and eight meters below the full supply level, 15 meters wide at each side of the bullnose.

客户

Alpinist Safety Consultants

承包商

Alpinist Safety Consultants

防护对象

Infrastructure, Other

腐蚀保护

GEOBRUGG SUPERCOATING

工程

MSJ Geotechnical Consulting Services

其他安装的应用程序

边坡稳定

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址