스위스
스위스

myGeobrugg

Bubichopf - BLS Goppenstein–Brig line

낙석방호시스템 - Bubichopf - BLS Goppenstein–Brig line 2010

-

낙석방호시스템 - Bubichopf - BLS Goppenstein–Brig line 2010

-

낙석방호시스템 - Bubichopf - BLS Goppenstein–Brig line 2010

-

 

System length

42 m

 

Year of installation

2010

Situation

-

Description

In compliance with all the requirements, an RXI-100 rockfall protection barrier was installed, measuring 42.5 meters long by 4 meters high and with a distance of 8.5 meters between the posts. The maximum permitted barrier deflection after a 500 kJ event was verified and validated using FARO software. To guarantee compliance with a maximum net deflection of 3 m after a maximum rockfall event of 500 kJ, two additional GEOBINEX retaining ropes with brake rings were installed diagonally on each section of net. The special additional retaining ropes were affixed to separate anchors.

Customer

BLS, Bern-Lötschberg-Simplon Bahn AG

Protected object

Railway

Engineering

Ing.büro Reinhold Bumann GmbH, Naters (Canton of Valais)

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

자연 재해
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 스위스 Ticino Country Manager

E-Mail