스위스
스위스

myGeobrugg

낙석방호시스템 - Hydropowerplant Chile I 2016

The barrier and the protected area

낙석방호시스템 - Hydropowerplant Chile I 2016

During installation

낙석방호시스템 - Hydropowerplant Chile I 2016

Final installation works

낙석방호시스템 - Hydropowerplant Chile I 2016

Final installation works

낙석방호시스템 - Hydropowerplant Chile I 2016

View on the protected tunnel entrance

낙석방호시스템 - Hydropowerplant Chile I 2016

Lateral view on the RXE-1000 barrier

낙석방호시스템 - Hydropowerplant Chile I 2016

Protected area, barrier in the background

 

Systems

 

시스템 길이

120 m

 

설치 년도

2016

Situation

In the area of the portal of the VA2 tunnel of the Alto Maipo project, rockfalls caused damage to the surrounding infrastructure and interruptions in operations. It was urgently necessary to find a solution that would allow working in a safe manner.

Description

To retain rocks up to 1000 kJ of energy, Geobrugg proposed the construction of an RXE-1000 rockfall barrier with the following characteristics.

  •     Height:5 meters
  •     Post spacing: 10 meters
  •     Anchors to the mount: 4 meters long
  •     Anchors in the plate, subjected to compression: 4 meters
  •     Anchors in the plate, subjected to traction: 3 meters
  •     Anchors edge: 5 meters
  •     120 linear meters

Engineering and placement of the barriers were carried out by Swiss company Geotest.

Country/Region

칠레

Customer

Proyecto hidroelectrico Alto Maipo

Engineering

Geotest

Contractor

Incolur

Protected object

Building, Mine / Quarry, Infrastructure

부식방지

GEOBRUGG SUPERCOATING

Your local contact

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

자연 재해
수리학
광산 / 터널
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

이메일

Olivia Sartorius
   

Olivia Sartorius

자연 재해
수리학
광산 / 터널
Geobrugg AG

이메일

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

자연 재해
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / 스위스 Project Manager Inspection Services

이메일

Isacco Toffoletto
   

Isacco Toffoletto

자연 재해
수리학
광산 / 터널
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 스위스

이메일